(806) 375-4850

Asphalt Overlay

Amarillo Pavement Pros: Asphalt Overlay and Resurfacing in Amarillo, TX

Amarillo Pavement Pros connects commercial property owners in Amarillo, TX with local pavement contractors, and this page covers asphalt overlay across Potter County and Randall County and the wider Texas Panhandle.

  • Amarillo and 20 miles around it
  • Commercial and industrial property
  • We work with licensed, insured local contractors
  • Written price before work starts

Put off resurfacing while the surface is still sound and water reaches the base course, which turns a $24,000 overlay into a $95,000 full-depth reconstruction.

(806) 375-4850

When a lot is a resurfacing candidate and when it is not

The question that decides an overlay is not how bad the surface looks. It is whether water has got through to the base course yet.

Asphalt fails from the bottom up. The surface oxidises, it shrinks, it cracks, and for a while those cracks are cosmetic. Once they open enough to admit water, the water moves down through the mat into the crushed base and, in this part of Texas, into the caliche subgrade underneath. Saturated base loses its bearing strength. The mat above it starts to flex under wheel loads it used to carry without moving, and flexing asphalt cracks in the interlocking pattern the trade calls alligatoring. After that the material pumps out under traffic and you have a pothole.

A lot that is oxidised, cracked and rutted but still structurally supported is the ideal overlay candidate. A lot with potholes, pumping fines or full-depth alligator cracking is telling you the base is already gone there, and new asphalt over a failed base fails in the same footprint within a season.

Walking the lot before anything is quoted settles it. Cores on larger jobs, a visual and a straightedge on smaller ones.

What a mill and overlay actually involves

Milling grinds off a controlled depth of the existing surface, normally 1.5 to 2 inches, using a drum with carbide teeth. It does three useful things at once. It removes the most oxidised and most cracked material, it keeps the finished grade where it was, and it leaves a rough textured surface that the new mat keys into.

Grade matters more than people expect. Lay two inches of new asphalt over the old surface and the lot rises two inches. Curbs get two inches shorter, drainage inlets stay where they were, and an accessible route that ran flush develops a lip. Anywhere a grade change would cause one of those, the surface gets milled first.

After milling, the surface is swept clean, a tack coat is applied so the new lift bonds to the old, and the hot mix goes down and is compacted while it is still hot enough to achieve density. Density is the part that decides how long the job lasts. Under-compacted asphalt carries too many air voids, water gets into those voids, and the mat starts failing early no matter how good the material was.

Why Panhandle lots need this sooner than lots further south

Amarillo sits at 3,606 feet on the Llano Estacado, and the pavement here takes a specific combination of loads that a lot in Houston or San Antonio does not.

The dominant one is thermal cycling. NOAA engineering weather data records about 85 freeze-thaw cycles a year for Amarillo. Every one of those is water in a crack expanding as it freezes and contracting as it thaws, levering the crack a little wider. Eighty-five times a year is a great deal of work on a surface, and it is why a crack that would sit stable for years on the Gulf Coast opens up quickly here.

The second is ultraviolet exposure. At this elevation the sun strips the lighter fractions out of the binder faster than at sea level, which is the oxidation you see as a lot going grey. Brittle binder cracks under thermal cycling instead of flexing with it.

The third is the subgrade. Caliche makes a firm base dry and loses much of that wet, so keeping water out of the section is the whole job on this ground.

What the city requires when the surface is replaced

Off-street parking in Amarillo has to be surfaced with asphalt or concrete, connected to the street or alley by a similarly paved driveway, and marked to the parking design standards the city sets out in its Development Policy Manual. Resurfacing does not change any of that, but it does erase the existing markings, which means the layout gets re-established rather than simply re-traced.

That is also the moment accessible parking gets looked at properly. The Texas Accessibility Standards allow a maximum slope of 1:48, about two percent, in any direction across an accessible space and its access aisle. Lots settle over decades. A space that met that standard when the lot was built often does not by the time it needs resurfacing, and putting the paint back exactly where it was preserves a problem instead of fixing it.

There is a drainage angle too. Amarillo runs a drainage utility, and impervious surface is what that system is concerned with. Resurfacing that corrects ponding and moves water to the inlets is doing the job the drainage design intended.

Where this sits against the other options

Crack sealing buys time on a sound lot for a fraction of the cost. Sealcoating protects the binder from UV and adds no structural value at all. Reconstruction rebuilds base and surface together and is what you do when the base is finished.

An overlay is the middle move and it has the best economics when the timing is right. Miss the window and the same lot needs reconstruction at three to five times the cost.

(806) 375-4850

What you are probably looking at right now

  • Alligator cracking spreading across the drive lanes but not yet through to base
  • Faded, oxidised grey surface that sheds loose aggregate when you brush it
  • Patch on patch, where each repair is now failing at its own edges
  • Standing water in the same spots after every rain, 48 hours later still there
  • Ruts and depressions where delivery trucks turn or idle
  • Crack sealant that has pulled away and left the crack open again

(806) 375-4850

What this usually costs

Overlay, structurally sound lot
$1.75 to $3.50 per sq ft
Mill and overlay, 1.5 to 2 inch lift
$2.25 to $5.00 per sq ft
Typical 10,000 sq ft commercial lot
$22,000 to $50,000

Ranges reflect published regional rates for commercial asphalt work, not a quote. Thickness, lot access, the condition of the existing base and the amount of patching needed before the lift all move the number. A written price is confirmed on site before any work starts.

Questions we get asked

What is the difference between an overlay and a mill and overlay?

An overlay lays new hot mix asphalt straight over the existing surface, which raises the grade by the thickness of the lift. A mill and overlay grinds off the top layer first, usually 1.5 to 2 inches, then lays the new surface back at the original height. Milling is what you do when raising the grade would bury a curb, block a door threshold, or break the slope on an accessible route.

How long does an asphalt overlay last in the Texas Panhandle?

A properly compacted overlay on a sound base typically gives 8 to 15 years here. The spread is wide because Amarillo runs about 85 freeze-thaw cycles a year, and a lot that holds water will use up the short end of that range while a lot that drains will reach the long end.

Can you overlay a parking lot that has potholes?

Not directly. Potholes mean the base has failed at those points, and new asphalt laid over a failed base fails again in the same spot within a season. Those areas get full-depth patched first, then the overlay goes over the repaired surface.

How much of my lot has to be closed, and for how long?

Work is normally staged in sections so the property keeps functioning. A section is milled, swept, tacked and paved the same day, and takes traffic once the mat has cooled.

Does an overlay project trigger a state accessibility review?

It can. In Texas, a commercial construction project with an estimated total cost of $50,000 or more has to be registered with the Texas Department of Licensing and Regulation, reviewed by a Registered Accessibility Specialist before construction, and inspected by one within a year of completion. A large lot resurfaced and restriped clears that threshold easily, and the accessible parking has to come back in compliance with the Texas Accessibility Standards rather than simply where the old paint was.

Is it cheaper to overlay now or replace later?

Overlay, by a wide margin, as long as the base is still sound. Published regional rates put resurfacing at roughly $1.75 to $3.50 per square foot against $8.00 to $15.00 for full-depth replacement. The whole decision is about whether water has reached the base yet.

Related work

Asphalt Milling and Pavement Grinding

Asphalt milling and pavement grinding in Amarillo, TX. Removes the worn surface and holds the original grade before an overlay. Call for a site look.

Parking Lot Repair and Asphalt Patching

Parking lot repair and asphalt patching in Amarillo, TX. Full-depth patching that fixes the base, not just the surface. Call for a site look.

Asphalt Crack Sealing

Hot-pour asphalt crack sealing in Amarillo, TX. The cheapest work that keeps water out of the base and delays resurfacing. Call for a site look.

ADA and TAS Parking Compliance

ADA and Texas Accessibility Standards parking compliance in Amarillo, TX. Slope, signage and access aisles brought to TAS. Call for a site look.

(806) 375-4850

Get a straight assessment

Talk to someone about your lot

Tell us what the surface is doing and we will tell you whether it is a sealing job, a patching job or a resurfacing job before anybody quotes it.